Infrastructure

For fulfillmentof our Production capacity and also keeping in mind the Green Ship Recycling Aspects following Infrastructure has been developed :

  • 3 heavy duty cranes with a capacity of up to 40 tons.
  • 1 light duty crane with a capacity of up to 20 tons.
  • 1 JCB Liftall for loading of material – 10 tons capacity
  • 1 JCB Backhoe Loaders for cleaning the plot and for other developments
  • 1 Bulldozer for maintenance of Ship Recycling Yard.
  • 1 Magnetic Excavator (JCB) – Capacity 5 tons – An Innovative initiative only one in Alang
  • 1 excavator for removal of material from Engine room – Increases Safety and Efficiency
  • 4 emergency water tanks on field – with a total capacity of around 150,000 litters
  • Developing an emergency water tank on every ship – as soon as a ship is beached a water storage tank is created for unforeseen fire
  • Several Fire-extinguishers are available everywhere on the field as well as on the ship
  • Hazardous Waste Management Room – Asbestos Abatement Vacuum
  • Hazardous Waste Storage Room – 10 Rooms
  • In-house Hospital developed for Regular Check-up and Emergency.
  • Weigh Bridge – 100 tons
  • Resting room for labor
  • Oil Discharge Area – completely concreted space with proper drainage system
  • Liquefied Oxygen Storage Tank – Risk free as it is kept far away from cutting area.
  • LOT (Liquid Off Take) System Installed – An Innovative initiative only one in Alang.